« product 24 of 32 »

Metalog Leonardo's Bridge

Overcoming any obstacle.

Item No.: 0260.412

Dispatches in 5 business days Dispatches in 5 business days

EUR 230.00
excl. VAT and P & P

Hotline

Support

+49 6659 88-159
Mo.-Thu.: 8.00 -16.00
Fr.: 8.00 -16.00

The Project. The idea for this construction comes from the universal genious Leonardo Da Vinci. Around 1480 he designed a transportable bridge, which can be mounted without tools. Important goals in team development are creating stability within the group and the ability to bridge gaps and overcome obstacles. So let your group face this challenge! Leonardo's Bridge will result in a visible success that will promote the team spirit.

How It's Done. The participants' task is to construct a stable bridge of 4 meters size, using only the 28 sticks provided. It is not allowed to use any other tools. After brainstorming in smaller subgroups at first, all participants start constructing the bridge. The key factors for succeeding are coordination within the group, creativity and sharing know-how. The result will be a self-supporting construction, which may serve as a metaphor for internal and external team stability. Another issue that can be adressed is a team growing closer; for instance, in an intercultural environment. The participants start constructing the bridge, beginning at two ends. The bridge brings them closer together; in the end, the two parts of the bridge become one. The key factors for success are coordination, cooperation and adjustment (as regards the method of construction) between the two subgroups.

Persons (min./opt./max.): 6/10/14.
Time (without debriefing): 45-60 minutes.
Space: 10 x 8 meters.

Topics & Goals. Team Building: Interface communication, dealing with shortages, coordination, team interaction, moderating. Project Management: Dealing with sparse resources, sharing know-how, finding creative solutions. Intercultural Communication: Adjustment, accepting others' views and ideas.

Leonardo's Bridge. In the box: 28 sticks (wood, sanded, coated in red), 28 small sticks for the planning stage, 1 detailed instruction sheet.

Dimensions: 2 boxes, each 12 x 12 x 100 cm. Weight: 3.2 kg incl. box. Ships in two robust transport plastic tubes with shoulder straps.

Click to enlarge
Metalog Leonardo's Bridge

Overcoming any obstacle.